Civic Center Station Under Construction (Los Angeles)Artist’s rendering, 1984
The stages, left to right: utility re-routing; drilling piles; installation of soldier piles; beams, bracing, and decking in place; excavation in process; begin concrete work. 
The station opened in 1993 and is currently served by the red and purple lines.

Civic Center Station Under Construction (Los Angeles)
Artist’s rendering, 1984

The stages, left to right: utility re-routing; drilling piles; installation of soldier piles; beams, bracing, and decking in place; excavation in process; begin concrete work. 

The station opened in 1993 and is currently served by the red and purple lines.